精品久久久久久国产潘金莲,日本强好片久久久久久AAA,日韩美女在线观看一区,JAPAN丰满人妻HDXXXX

新聞資訊

News

當前位置:首頁 > 新聞資訊

YD多速電機如何接線

發(fā)布者:新鄉(xiāng)市恒通電機有限公司  發(fā)布時間:2018-05-03 瀏覽:2028

YD多速電機如何接線。、電動機Y/Y2/Y3/YE3系列電動機的繞組引出線為6根。YD/YZD/YDT系列雙速、三速及四速電動機根據不同繞組有可能為6/9/12根。

1. There are 6 lead-out wires of the motor windings for Y/Y2/Y3/YE3 series. The number of the lead-out

   wires for the motor windings could be 6/9/12 depending on different windings types, for YD/YZD/YDT series

   two-speed, three-speed and four-speed motors.

    2、電動機的旋轉方向從軸伸端視為順時針方向,任意對調三相電源線中的兩根,電動機可改變轉向。

2. The rotation direction of the motor is clockwise (viewed from shaft extension end). Any swap between 

       two of the three-phase power lines can change the motor steering.

    3、按照接線圖接好電源線(YD/YZD/YDT系列電動機要按照接線圖要求連接好引出線)。外接額定電壓進行電動機空載試驗。

注意:大極比S3(周期)工作制電動機空載試驗時間不宜過長,觀察電動機是否有異?,F象,否則應迅速斷電檢查。

    3. Connect the power lines in accordance with the wiring diagram(the lead-out wires of the YD / YZD / YDT 

  series motor should be connected in accordance with its wiring diagramm). Power the motor with rating 

  voltage the test it with no-load at first.

   Note: For motors with S3 operating system, the no-load test should not last too long. Observing are    there    any abnormal phenomenas, otherwise you should cut off the power supply immediately and check the system.

多速電機

首頁 電話 TOP
亚洲精品白浆高清久久久久久| 无码av免费一区二区三区| 99麻豆久久久国产精品免费| 久久精品国产亚洲一区二区| 少妇XXXXX性开放| 日韩在线中文高清在线资源|